Insights · Office moves

Office IT relocation in Dubai: a checklist for moving without downtime

What to plan for your IT when your firm moves office in Dubai or Abu Dhabi: internet lines, cabling, the comms room, WiFi, phones, security and a weekend cut-over.
The short answer

Start planning your IT as soon as you sign the lease. The internet connection to the new building usually takes longest, so order it first. Then agree cabling, the comms room, WiFi, phones and security with your fit-out contractor, and move over a weekend with a tested cut-over plan, so your team starts the next working day at their new desks with everything working.

Key points
  • Find out which telecom provider serves the new building and order business internet early, with a backup.
  • Agree data points, the comms room, power and cooling with the fit-out contractor before the walls go up.
  • Plan the cut-over for a weekend, with a way back and engineers on site the next morning.
  • Securely wipe or destroy anything that held data before it leaves the old office.

When to start

Treat IT as part of the fit-out, not something to sort out in the last week. As a guide, the order of work is:

  1. Lease signed. Survey the new space, find out which telecom provider serves the building and order internet.
  2. Fit-out design. Agree data points, the comms room, power and cooling, WiFi and access control with the fit-out contractor.
  3. A month or more before. Confirm installation dates, order new hardware and write the move plan.
  4. Move weekend. Cut over, test and check every desk.
  5. First week. On-site support and a snagging list.

Internet and phone lines

In many Dubai buildings the telecom provider is set by the building, either e& (formerly Etisalat) or du, so you may not be able to keep your current provider. Ask the landlord which provider serves the building and order business internet as soon as you can; installation dates depend on the provider and the building.

Order a backup connection too, such as a second line or a 4G/5G router, so the office is not offline if the main line is delayed or fails. Check whether your existing landline numbers can move with you; if they cannot, plan new numbers and a forwarding period, or move to a cloud phone system and test it on the new connection before the move.

Cabling, comms room and power

Agree with the fit-out contractor where every data point goes: desks, meeting rooms, printers, WiFi access points, CCTV, screens and access control. Cabling should be tested and labelled, with each point matched to a numbered patch panel port.

The comms room or rack needs its own power, a UPS, cooling and a lock. A cupboard with no ventilation is one of the most common causes of equipment failures. Many buildings in Dubai and the free zones have their own fit-out rules on who can run cabling and where, so check them early.

WiFi, network and security

Plan WiFi from the floor plan, with enough access points for meeting rooms and busy areas, and separate networks for staff, guests and devices such as printers and cameras.

A move is a good time to replace an ageing firewall, for example with a FortiGate next-generation firewall set up with VPN, network segmentation and logging. Plan access control and CCTV at the same time, because they share the same cabling and network.

The move weekend

Write a cut-over plan with times, owners and a way back if something fails. Back up servers and key data before anything is switched off, label every device and cable, and move the network and servers first so everything else has something to connect to.

Test internet, WiFi, phones, printers, your business applications and remote access before the weekend ends, then have engineers in the new office first thing the next working day to fix anything at desks.

Leaving the old office

Decide what to move, what to replace and what to dispose of. Any device that held data, including PCs, servers, copiers and phones, should be wiped to a recognised standard or destroyed, with a certificate as proof, so no client or personal data leaves with old equipment.

Cancel old lines and services at the right time, after the new ones are working, and update your address with your providers, insurers and, if you are regulated, your regulator.

Extra steps for DIFC and ADGM firms

If you are regulated, treat the move as a significant change. Check whether you need to notify your regulator of the new address or of a material change to your systems, update your business continuity and disaster recovery plans, and keep a record of the change, the testing and the sign-off.

That record is exactly the kind of evidence an auditor will later ask for. Our IT audit readiness checklist explains what to keep, and our IT projects team can plan and run the move.

Sources and further reading

Last reviewed 6 October 2026. This guide is general information, not legal or regulatory advice. Rules change, so check the current text and take advice from your compliance officer or legal adviser before relying on it.

Written by
CEO, Cre8 IT
Rob Crossley is CEO of Cre8 IT, a Dubai-born managed IT and cyber security company that has supported businesses across the UAE, Saudi Arabia and the UK since 2012. Cre8 IT is certified to ISO 27001:2022 and ISO 9001 and is a certified Microsoft Partner.
FAQ

Frequently asked questions

When should we start planning the IT for an office move?

As soon as the lease is signed. The internet connection and cabling usually set the timeline, so the earlier they are ordered and agreed with the fit-out contractor, the smoother the move.

Can we keep our phone numbers when we move office in Dubai?

It depends on your provider and whether the new building is served by the same one. Check before you commit to dates; if the numbers cannot move, plan new numbers and a forwarding period, or move to a cloud phone system.

Should we move our IT over a weekend?

Usually, yes. A weekend cut-over gives time to move, connect and test everything, with engineers on site first thing on the next working day.

What should we do with old computers and servers?

Wipe them to a recognised standard such as NIST SP 800-88, or have them destroyed, and keep the certificate. This applies to anything that held client or personal data, including copiers and phones.

Related guides

Keep reading

Each guide links to the regulator’s own text and shows when it was last reviewed.
Managed IT

Managed IT services in Dubai: what’s included and what drives the cost

How managed IT services work for firms in Dubai and Abu Dhabi: what a good contract covers, how pricing is structured, what is usually extra and how to compare providers.
4 min read · Reviewed 6 October 2026
Audit readiness

IT audit readiness for DIFC and ADGM firms: an evidence-first checklist

How to be ready when a regulator, auditor or client asks for proof of your IT and security controls: the evidence pack, a mock audit and a six-week plan.
3 min read · Reviewed 19 September 2026
Microsoft 365

Microsoft 365 governance for regulated firms: a practical baseline

How to govern Microsoft 365 in a DFSA- or FSRA-regulated firm: identity, devices, data, logging and licences, with a 30-day order of work.
4 min read · Reviewed 19 September 2026

Planning an office move?

Tell us your move date and the new address, and we will plan the IT so your team can start work on day one.